Notes on Reservation: Difference between revisions
Content deleted Content added
Created page with "* '''Plasma Chamber''' does not require reservations. Assumption is that usage will be a short time prior to wire bonding or die attach. For experiment which will take longer than 15minutes, contact Protofab staff. * '''Ovens''' do not require reservation. They can be shared as long as cure profile matches your application. * UV cure systems are part of Manual Assembly Station and can be reserved through..." |
mNo edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
Line 1:
* [[Die Shear and wire Pull Tester (F&S 5600i Pull/Shear Tester)|'''Wire pull and Die Shear Tester''']] is part of the [[Ball & Wedge Bonding (F&S 56i Wire Bonder)|'''Wire Bonder''']] and should be available to reserve.
* '''[[Plasma Treatment (Glen Technologies, Yield Engineering, R3A Asher)|Plasma Chamber]]''' does not require reservations. Assumption is that usage will be a short time prior to wire bonding or die attach. For experiment which will take longer than 15minutes, contact Protofab staff.
* '''[[Bake Chamber (Yamato DKN Series Forced Convection Ovens)|Ovens]]''' do not require reservation. They can be shared as long as cure profile matches your application.
* [[UV Curing System (Panasonic Aicure UJ35 UV LED Spot Cure)|UV cure systems]] are part of [[Manual Assembly Station]] and can be reserved through that portal.▼
* [[
▲* [[
| |||