Notes on Reservation: Difference between revisions

From ProtoFab
Jump to navigation Jump to search
Content deleted Content added
No edit summary
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
* [[Die Shear and wire Pull Tester (F&S 5600i Pull/Shear Tester)|'''Wire pull and Die Shear Tester''']] is part of the [[Ball & Wedge Bonding (F&S 56i Wire Bonder)|'''Wire Bonder''']] and should be available to reserve.
* '''[[Plasma Treatment (Glen Technologies, Yield Engineering, R3A Asher)|Plasma Chamber]]''' does not require reservations. Assumption is that usage will be a short time prior to wire bonding or die attach. For experiment which will take longer than 15minutes, contact Protofab staff.
* '''[[Plasma Treatment (Glen Technologies, Yield Engineering, R3A Asher)|Plasma Chamber]]''' does not require reservations. Assumption is that usage will be a short time prior to wire bonding or die attach. For experiment which will take longer than 15minutes, contact Protofab staff.
* '''[[Bake Chamber (Yamato DKN Series Forced Convection Ovens)|Ovens]]''' do not require reservation. They can be shared as long as cure profile matches your application.
* '''[[Bake Chamber (Yamato DKN Series Forced Convection Ovens)|Ovens]]''' do not require reservation. They can be shared as long as cure profile matches your application.

Latest revision as of 15:10, 15 April 2026