Thermal Cure: Difference between revisions

From ProtoFab
Jump to navigation Jump to search
Content deleted Content added
linked UV curing page for initial tack
updated recipes table
 
(One intermediate revision by the same user not shown)
Line 21: Line 21:
|120°C/30min
|120°C/30min
|100°C/1 hour
|100°C/1 hour
|175°C/1min
⚫
|
|
|
|-
|-
Line 58: Line 58:
|
|
|1500mW/cm2 for 30 sec
|1500mW/cm2 for 30 sec
|-
|UNIMEC H9890-6A
|Ramp up 60 min. to 175°C + 90 min. hold @ 175°C
⚫
|
|
|
|
|}
|}

* Curing UNIMEC H9890-6A at lower temperatures may result in lower thermal conductivity

Latest revision as of 07:57, 21 September 2026

Bake Recipes

The following are recommended cure times and temperatures based on manufacturer's technical data sheet information. For hybrid materials, do UV initial tack before thermal bake for full crosslink.

Bake Recipes
Material Recommended Cure (Temp°C/Time) Alternate 1 Alternate 2 Alternate 3 Initial Tack
HYB-353ND 100°C/30 min 150°C/30 min 80°C/ 1 hour 100mW/cm2 for 1min
H70E 150°C/1 hour 120°C/30min 100°C/1 hour 175°C/1min
H20E 150°C/1 hour 80°C/3 hours
GA700H 100°C/1 hour 150mW/cm2 for 2 min
3553-LV-UTF_HM 110°C/1 hour 1000mW/cm2 for 30 sec
CHIPSHIELD 2401 110°C/1 hour 1000mW/cm2 for 30 sec
OPTOCAST 3410 110°C/1 hour 1500mW/cm2 for 30 sec
UNIMEC H9890-6A Ramp up 60 min. to 175°C + 90 min. hold @ 175°C
  • Curing UNIMEC H9890-6A at lower temperatures may result in lower thermal conductivity